Data Centers

Generator startup takes 10–15 seconds. UPS bridges that gap. If either component fails to perform at the moment of transfer, downtime follows. Redundancy is not protection unless it's been validated under load.

Data Centers

Data Center Power That Performs at Transition, Not Just at Rest

Generator startup takes 10–15 seconds. UPS bridges that gap. If either component fails to perform at the moment of transfer, downtime follows. Redundancy is not protection unless it's been validated under load.

Engine Cutaway.I09.2k.png

Overview

Data center backup systems are often validated at the component level—not as a fully integrated system under real IT and cooling load.

We validate how generators, UPS systems, and transfer switches perform together under real IT load—not in isolation. Redundancy is confirmed against actual demand. Transfer timing is tested under conditions that reflect what happens when a real outage occurs.

Where Data Center Power Systems Fail

  • Redundancy installed but never tested under load: N+1 on paper, N in practice

  • Transfer timing failures: generator and UPS not synchronized, causing a gap during failover

  • Cooling load excluded from generator sizing: IT load is met but cooling collapses

  • Fuel system issues in infrequently-tested systems: degraded fuel causes failure under sustained load

  • Capacity gaps: systems sized for current load with no margin for growth or simultaneous demand peaks

Uptime Validated at the System Level, Not Component by Component

Uptime Validated at the System Level, Not Component by Component

We validate how generators, UPS systems, and transfer switches perform together under real IT load—not in isolation. Redundancy is confirmed against actual demand. Transfer timing is tested under conditions that reflect what happens when a real outage occurs.

Requirements

Data center generator requirements are defined by IT load, cooling demand, Tier classification, and redundancy design. Each changes the total system capacity required.

Data center sizing is based on IT load, cooling demand, and redundancy tier. Here's what each scale of facility typically needs.

calculate your power

Know Exactly What It Takes to Keep Power On

From essential backup to full-scale operations—get a clear, grounded recommendation based on how your property actually runs.

Data Centers

SERVICES

Specific Support for Specific Systems

Generator control panel showing load test mode and system status

Maintenance

Load Bank Testing

Full-Load Testing

Generator fuel cap and tank access during refueling or inspection

Maintenance

Fuel Management

Testing + Fuel Polishing

Upgraded generator component with digital performance and energy output visualization

Upgrades

Futurization

Capacity + Redundancy Planning

Technician reviewing generator data on multiple monitoring screens

Visibility

Remote Monitoring

Alerts + Diagnostics

Emergency stop button on generator system for immediate shutdown

Emergency

Emergency Response

Rapid Diagnosis + Repair

Technician inspecting internal generator components during routine maintenance

Maintenance

Preventative Maintenance

Inspection + Performance Checks

Technician installing and wiring generator system components

Installation

Generator Installation

Sizing + System Integration

CALCULATE YOUR POWER

FAQ

How do I determine the right generator size for a data center?

Data center generator sizing is based on critical IT load, redundancy requirements, and uptime standards — not building size.


Start with:

  • Total IT load (kW or MW)

  • Cooling systems required to support that load

  • Redundancy level (N, N+1, 2N)


⚡️ Examples by data center scale:


Small server room (100–500 kW IT load):

  • IT equipment: 100–500 kW

  • Cooling: 50–200 kW


⚡️ Typical generator: 250–750 kW


Mid-size data center (1–5 MW IT load):

  • IT equipment: 1–5 MW

  • Cooling: 500 kW–2 MW


⚡️ Typical generator: 2–8 MW (often N+1 redundancy)


Enterprise / hyperscale (10+ MW IT load):

  • IT equipment: 10+ MW

  • Cooling + infrastructure: several MW additional


⚡️ Typical generator: multiple units totaling 15–30+ MW (N+1 or 2N)


⚡️ What this means:

  • Generator sizing must include both IT load and cooling systems

  • Redundancy is required — not optional — to maintain uptime

  • Systems are typically designed with backup capacity beyond demand

  • Use a generator sizing calculator to estimate capacity based on your IT load and redundancy requirements

Untitled-3 (2).png

CONTACT

Reliable power
doesn’t happen by accident.

Whether you’re planning a new generator, upgrading what you have, or making sure it performs when it counts, we’ll help you get it right.